With the help of the donors and volunteers, the construction of the primary water supply system for 40 households has started.
Phase 1 was complete, and it included:
–  construction of the water-capturing reservoir (27m3) which will be filled with water using the capacities of the local public faucet.

–  a reservoir-filling hose has been dug in and the 150m long part which is going through the nearby picnic sites and below the asphalt road.

– A part of the materials for the continuation of the construction and linking with the existing reservoir 500m lower has been supplied.
With the conclusion of the project, conditions for the quality water supply of the households are created. These households are in the regime of summer water restrictions due to their altitude.

 